Investor: Binh Thuan Water Supply and Sewerage Joint Stock Corporation
Production scale: 10,600,000m³/day
Investment value: 7500 billion
Location: No. 137, Le Hong Phong, Quarter 2, Phu Trinh Ward, Phan Thiet City, Binh Thuan Province
Area: 600,000 hectares
By 1991-1992, when Thuan Hai province was divided into two provinces, Binh Thuan and Thuan; Ninh Thuan, Xí Drilling Industry – Thuan Hai Water Supply was re-established with the name Binh Thuan Water Supply Company according to Notice No. 334/TB-DNNN dated November 17, 1992 of Ministry of Construction and Construction Decision No. 746/QD-UBBT dated December 11, 1992 of the People's Committee of Binh Thuan province.
On August 1, 2007, the People's Committee of Binh Thuan province issued Decision No. 1944/QD-UBND on the shares of Binh Thuan Water Supply Company. .
From October 1, 2009, Binh Thuan Water Supply Company officially operates in the form of a Joint Stock Company.
Subordinate units of the Company:
- Phan Thiet water supply branch;
- La Gi water supply branch;
- Bac Binh Water Supply Branch
- Xí Construction and installation industry Water supply and drainage;
- Xí Phan Thiet water industry
1- Phan Thiet Water Supply Branch :
Built in the years 1928-1933, with a capacity of 300 m3/day, the processing technology line surface water. After the Liberation Day April 30, the house Phan Thiet water plant was taken over, the capacity was only limited; nearly 3,000 m3/day, machinery and equipment were installed in 1968-1970.
Through the renovations, it has increased its capacity; The machine arrived in 1977-1978, 1989-1990 and 1997-2001, lowest capacity; This area is gradually increased from nearly 3,000 m3/day to 22,000 m3/day. The pipeline network was renovated and; Expand the scope of water supply. The machine equipment system has been innovated, and automatic technology has been applied to a number of stages in the factory's production line. máy. Water quality testing and measurement equipment is gradually being equipped and perfected, to ensure clean water quality supplied to consumers.
The number of customers ranged from more than 760 customers in 1975, to December 2016. có 41,634 customers; In addition to serving daily needs, clean water also serves production and production activities. local services.
2- La Gi water supply branch:
Construction and formation; Operating before 1968, capacity of 1,200 m3/day, with the call name; Hanoi water plant. In 2000, nhà The factory was invested in and built a new processing cluster. filtration, level I pumping station, clean water tank for heating with capacity of 6,000 m3/day. Next door The water supply pipe network was invested and installed to expand the water supply scope. Pipe lines installed before 1975 were gradually replaced every year, and new equipment was equipped. By January 2017, 16,993 customers.
3- Bac Binh Water Supply Branch :
3.1- Song Mao water supply system :
Song Mao water supply system was invested and built in 1978 with a capacity of 2,400 m3/day, with treatment technology; surface water. Serving clean water supply for daily life and production of residential areas. Hai Ninh, far away; Phan Hiep, Cho Lau town, Phan Rí Thanh, xã Binh Liêm, xã Hong Thai belongs to the district capital of Bac Binh province.
Year 1998 andà 2003 invested in building 2 more processing clusters. water filtration plant, capacity 100 m3/hour, clean water tank with capacity of 250 m3 to increase the production capacity of the factory. máy. Current capacity is 4,500 m3/day, until January 2017. 8,277 customers.
3.2- Hoòa Thang water supply system (Lê area)
In 1989, Nhaà The country invested in building the Hoa Thang water supply system, with a capacity of 1,200 m3/day. By 1997, the farm had a capacity of 3,600m3/day, providing clean water for daily life and daily use. production of residential buildings Thang Ha, Bac Binh district (Lecirc; war zone in the air war against the US and to save the country). By January 2017, 1,001 customers.
4- Xí Construction and installation industry Water supply:
Established in 2000, at the base of the previous Pipeline Installation Team, the main tasks were; Construction and installation of N-level pipelines